Violation Detail
Standard Cited: 19100305 A02 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1058846.015
Citation: 01006
Citation Type: Serious
Abatement Date: 09/18/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/14/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): C
Gravity: 5
Report ID: 0112600
Contest Date:
Final Order: 09/03/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/03/2015 | $0.00 | 09/18/2015 | Serious | |
Penalty | Z: Issued | 08/14/2015 | $0.00 | 09/18/2015 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.305(a)(2)(ii): Temporary wiring was not removed immediately upon completion of the project or purpose for which the wiring was installed: Spray room, 425 St James Ave, Springfield MA: The extension cord on the back wall of the spray area was not removed upon completion of the task for which it was installed.