Violation Detail
Standard Cited: 19100217 E01 I Mechanical power presses.
Inspection Nr: 1029772.015
Citation: 01006
Citation Type: Serious
Abatement Date: 05/18/2015 2
Initial Penalty: $7,000.00
Current Penalty: $6,000.00
Issuance Date: 04/23/2015
Nr Instances: 2
Nr Exposed: 20
Related Event Code (REC): A
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 06/02/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/02/2015 | $6,000.00 | 05/18/2015 | Serious | |
Penalty | Z: Issued | 04/23/2015 | $7,000.00 | 05/18/2015 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.217(e)(1)(i): A program of periodic and regular inspections of mechanical power press(es) was not established and followed to ensure that all parts, auxiliary equipment and safeguards were in a safe operating condition and adjustment: a.) Shiloh Industries, Inc. dba Wellington Stamping located at 350 Maple St. Wellington, OH 44090; On or about February 5, 2015, the employer did not assure a program of periodic and regular inspections of the OBI Danly Mechanical Power Presses were established, completed, and certified. Employees were exposed to amputation hazards from bypassed safety features, top stop malfunctions, and no keys for the selector switches.