Violation Detail
Standard Cited: 19100242 B Hand and portable powered tools and equipment, general.
Inspection Nr: 1024668.015
Citation: 01006
Citation Type: Serious
Abatement Date: 04/14/2015 2
Initial Penalty: $3,500.00
Current Penalty: $1,750.00
Issuance Date: 03/26/2015
Nr Instances: 8
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0111700
Contest Date:
Final Order: 04/13/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/13/2015 | $1,750.00 | 04/14/2015 | Serious | |
Penalty | Z: Issued | 03/26/2015 | $3,500.00 | 04/14/2015 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.: a. Location: Machine shop building - Compressed air at the VMX42 Horco machine was measured at 80 p.s.i. b. Location: Main Prototek building - Compressed air at the sheetmetal machining area was measured at 80 p.s.i. c. Location: Main Prototek building - Compressed air at the sheetmetal machining area was measured at 50 p.s.i. d. Location: Main Prototek building - Compressed air at the plating area was measured at 110 p.s.i. e. Location: Main Prototek building - Compressed air at powder coating area was measured at 100 p.s.i. f. Location: Main Prototek building - Compressed air at powder coating area was measured at 70 p.s.i. g. Location: Main Prototek building - Compressed air at the deburring area was measured at 80 p.s.i. h. Location: Main Prototek building - Compressed air at new grinding area was 50 p.s.i.