Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1008277.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $3,500.00
Issuance Date: 01/14/2015
Nr Instances: 2
Nr Exposed: 8
Abatement Date: 02/09/2015
Gravity: 10
Report ID: 0936500
Contest Date:
Final Order: 02/09/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/09/2015 | $3,500.00 | 02/09/2015 | Serious | |
Penalty | Z: Issued | 01/14/2015 | $7,000.00 | 02/09/2015 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) At Hawthorne Army Depot Lockout-Tag-out Procedures BOP.IOP.MUO.0208 was not followed, there were no evidence that periodic and/or inspections were conducted. b) In Building 63, the lockout/tag-out (LO/TO) station locks were color coded red, the lock used on the cargo elevator switch was a master brand padlock, the tag on the cargo elevator switch was dated 2-9-11.