Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1006896.015
Citation: 01006
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 04/20/2015
Nr Instances: 1
Nr Exposed: 270
Abatement Date: 08/04/2017
Gravity: 10
Report ID: 0111400
Contest Date: 05/11/2015
Final Order: 11/04/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/04/2016 | $7,000.00 | 08/04/2017 | Serious | |
Penalty | C: Contested | 05/13/2015 | $7,000.00 | 06/09/2015 | Serious | |
Penalty | Z: Issued | 04/20/2015 | $7,000.00 | 06/09/2015 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment. Location: Tank Farm The company does not have written procedures to maintain the integrity of Tank Farm equipment such as propellant tanks, piping, relief valves, pumps, etc. It's program for maintaining the mechanical integrity of Tank Farm equipment is inadequate.