Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
This violation item has been deleted.
Inspection Nr: 1002958.015
Citation: 01006
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,800.00
Current Penalty: $0.00
Issuance Date: 02/23/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0728500
Contest Date:
Final Order: 03/24/2015
Related Event Code (REC):
Emphasis:
Substance: 8870
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/24/2015 | $0.00 | Serious | ||
| Penalty | Z: Issued | 02/23/2015 | $2,800.00 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: (a) At the Taneycomo water tower on or about October 22, 2014 had drop cords in use that had the grounding prong for the cords removed.