Violation Detail
Standard Cited: 19100305 J04 V Wiring methods, components, and equipment for general use.
Inspection Nr: 1674012.015
Citation: 01005E
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/11/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/28/2023
Gravity: 1
Report ID: 0316700
Contest Date:
Final Order: 10/05/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/05/2023 | $0.00 | 09/28/2023 | Other | |
Penalty | Z: Issued | 09/11/2023 | $0.00 | 09/28/2023 | Serious |
Text For Citation: 01 Item/Group: 005E Hazard:
29 CFR 1910.305(j)(4)(v):The disconnecting means was not readily accessible: (a) Refrigeration machine (engine) room - On or about June 15, 2023 the electrical disconnect switches for condenser #1 and condenser #2 and also for condenser pump #5 were not readily accessible to employees due to employees needing to over and around pipes and motors. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.