Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 554380.015
Citation: 01005C
Citation Type: Serious
Abatement Date: 11/07/2012 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/25/2012
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 10/23/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/23/2012 | $0.00 | 11/07/2012 | Serious | |
Penalty | Z: Issued | 09/25/2012 | $0.00 | 11/07/2012 | Serious |
Text For Citation: 01 Item/Group: 005C Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Next to the soap storage bin - On or about July 25, 2012, periodic inspection of the energy control procedures were not conducted at least annually.