Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1292018.015
Citation: 01005C
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/25/2018
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 08/22/2018
Gravity:
Report ID: 0523900
Contest Date: 08/20/2018
Final Order: 09/06/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/06/2019 | $0.00 | 08/22/2018 | Other | |
Penalty | C: Contested | 08/22/2018 | $0.00 | 08/22/2018 | Serious | |
Penalty | Z: Issued | 07/25/2018 | $0.00 | 08/22/2018 | Serious |
Text For Citation: 01 Item/Group: 005C Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): (a) Extrusion plant, Extrusion line 2; Point of operation guarding was not provided on the in-feed side of embossers.