Standard Cited: 19261101 G05 Asbestos
Inspection Nr: 1043352.015
Citation: 01005C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/10/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/14/2015
Gravity: 10
Report ID: 0524530
Contest Date: 08/27/2015
Final Order: 01/07/2019
Related Event Code (REC): C
Emphasis:
Substance: 9020
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/07/2019 | $0.00 | 08/14/2015 | Serious | |
Penalty | C: Contested | 09/01/2015 | $0.00 | 08/14/2015 | Serious | |
Penalty | Z: Issued | 08/10/2015 | $0.00 | 08/14/2015 | Serious |
Text For Citation: 01 Item/Group: 005C Hazard:
29 CFR 1926.1101(g)(5): Class I asbestos work was not performed using one or more of the control methods required by 29 CFR 1926.1101(g)(5)(i) through (g)(5)(vi): On or about March 2-3, 2015, Class I asbestos work was not performed using one or more of the following control methods: A.) Negative pressure enclosure; B.) Glove Bag System; C.) Negative Pressure Glove Bag System; D.) Negative Pressure Glove Box System; E.) Water Spray Process System; and/or F.) A small walk-in enclosure that complies with (g)(5)(vi) [A] through [B].