Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 98342.015
Citation: 01005B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 02/15/2012
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 03/01/2012
Gravity: 10
Report ID: 0524700
Contest Date: 03/08/2012
Final Order: 12/12/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 12/12/2013 | $0.00 | 03/01/2012 | Serious | |
| Penalty | C: Contested | 03/08/2012 | $7,000.00 | 03/01/2012 | Serious | |
| Penalty | Z: Issued | 02/15/2012 | $7,000.00 | 03/01/2012 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: a) Basic Grain Products, Inc. - Coldwater, Ohio: On or about August 22, 2011, a projecting shaft end located at the end of the conveyor on the mezzanine level (adjacent to the Triangle C machine) in the D Packaging area was not guarded. The rotating part exposed employees to a caught by hazard when sweeping the area. b) Basic Grain Products, Inc. - Coldwater, Ohio: On or about November 4, 2011, a projecting shaft end located on the D Seasoning oscillator was not guarded. The rotating part exposed employees to a caught by hazard when sweeping and taking product samples near the oscillator. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.