Violation Detail
Standard Cited: 19260062 D01 I Lead
Inspection Nr: 1794910.015
Citation: 01005B
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/11/2025
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 07/18/2025
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 07/14/2025
Related Event Code (REC): C
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/14/2025 | $0.00 | 07/18/2025 | Serious | |
Penalty | Z: Issued | 06/11/2025 | $0.00 | 07/18/2025 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1926.62(d)(1)(i): Each employer who had a workplace or operation covered by 29 CFR 1926.62 did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 ug/m3) calculated as an 8-hour time-weighted average (TWA): (a) Former Hotel Property at 677 Roosevelt Road, Glen Ellyn, IL 60137 - On or about December 20th, 2024, Concrete Construction Company did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 ug/m3) calculated as an 8-hour time-weighted average (TWA). Employees were exposed to lead during mechanical demolition of building components such as a steel beam covered with paint containing up to 0.12% lead. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).