Violation Detail
Standard Cited: 19100119 D03 I F Process safety management of highly hazardous chemicals.
Inspection Nr: 1787199.015
Citation: 01005B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/08/2025
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 06/26/2025
Gravity: 5
Report ID: 0316700
Contest Date: 06/03/2025
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 06/10/2025 | $0.00 | 06/26/2025 | Serious | |
| Penalty | Z: Issued | 05/08/2025 | $0.00 | 06/26/2025 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.119(d)(3)(i)(F): Information pertaining to the equipment in the process did not include design codes and standards that were employed. a. PSI - On or about November 12, 2024, the employer failed to include the edition of the design codes and standards which were employed for their process piping in their process safety information. Failure to define the edition they employ could result in improper inspection methods which can lead to release of flammable gas exposing employees to fire and/or explosion hazards. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Translate