Violation Detail
Standard Cited: 19261101 G08 II D Asbestos
This violation item has been deleted.
Inspection Nr: 1719781.015
Citation: 01005B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/24/2024
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 06/11/2024
Gravity: 5
Report ID: 0112000
Contest Date: 05/07/2024
Final Order: 09/20/2024
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/20/2024 | $0.00 | 06/11/2024 | Serious | |
| Penalty | C: Contested | 05/10/2024 | $0.00 | 06/11/2024 | Serious | |
| Penalty | Z: Issued | 04/24/2024 | $0.00 | 06/11/2024 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1926.1101(g)(8)(ii)(D): When built-up roofing with asbestos-containing roofing felts and an aggregate surface were removed using a power roof cutter, the dust resulting from the cutting operation was not collected by a HEPA dust collector or was not vacuumed along the cut line: Decommissioned Millstone Power Station Unit No. 1 Roof: On or about October 24, 2023, and sometime thereafter, when built-up roofing with asbestos-containing roofing felts and an aggregate surface were removed using power roof cutting tools that included, but were not limited to, a Milwaukee Sawzall Reciprocating Saw, the employer did not ensure that a HEPA dust collector or that HEPA vacuuming was performed along the cut line.