Violation Detail
Standard Cited: 19100147 F03 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1697373.015
Citation: 01005B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $0.00
Issuance Date: 03/06/2024
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 04/01/2024
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 03/22/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/22/2024 | $0.00 | 04/01/2024 | Serious | |
Penalty | Z: Issued | 03/06/2024 | $16,131.00 | 04/01/2024 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.147(f)(3)(i): A procedure was not utilized to afford the employees a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device when servicing and/or maintenance was performed by a crew, craft, department or other group: On or about September 6, 2024, at the Inta-Roto (IR) Coater Slitter (Serial: 82M-COAT-01), employees performed maintenance activities including, but not limited to setting up and threading the slitter separator. A group lockout procedure was not utilized, exposing employees to making contact with the ingoing nip points of the unguarded rotating rollers.