Violation Detail
Standard Cited: 19100179 N03 I Overhead and gantry cranes.
Inspection Nr: 1579386.015
Citation: 01005B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/03/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/31/2022
Gravity: 10
Report ID: 0521100
Contest Date:
Final Order: 08/29/2022
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/29/2022 | $0.00 | 08/31/2022 | Serious | |
Penalty | Z: Issued | 08/03/2022 | $0.00 | 08/31/2022 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.179(n)(3)(i): The load shall be well secured and properly balanced in the sling or lifting device before it is lifted more than a few inches. On or about February 15, 2022, with respect to an establishment located at 1101 Perry St, Algoma, WI 54201, the employer failed to ensure loads, such as Penthouse skids, were properly secured and balanced before lifting.