Violation Detail
Standard Cited: 19100333 B02 IV B Selection and use of work practices
Inspection Nr: 1453695.015
Citation: 01005B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/30/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/18/2020
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 05/27/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/27/2020 | $0.00 | 05/18/2020 | Serious | |
Penalty | Z: Issued | 04/30/2020 | $0.00 | 05/18/2020 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.333(b)(2)(iv)(B): 29 CFR 1910.333(b)(2)(iv)(B): Before circuits or equipment was worked as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed and did not verify that the circuit elements and equipment parts were deenergized: Ball, Bounce and Sport, Inc. - Dunkirk, Ohio: On or about January 3, 2020, a qualified person did not use appropriate test equipment to ensure the circuit elements and electrical parts of a 220 volt electrical motor, used to power the fans at the 1500 mold machine cooling chamber, were deenergized before accessing electrical components to replace the motor.