Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 1377874.015
Citation: 01005B
Citation Type: Serious
Abatement Date: 04/29/2019 2
Initial Penalty: $3,789.00
Current Penalty: $0.00
Issuance Date: 04/03/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 04/23/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/23/2019 | $0.00 | 04/29/2019 | Serious | |
Penalty | Z: Issued | 04/03/2019 | $3,789.00 | 04/29/2019 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.303(c)(3)(i): Conductors were not spliced or joined with splicing devices identified for the use or by brazing, welding, or soldering with a fusible metal or alloy. a) On or before February 12, 2019 at the site above the Sawstop table saw, employees were exposed to electrical shock hazards where conductors were not spliced with devices identified for the use, or by brazing, welding or soldering.