Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1202344.015
Citation: 01005B
Citation Type: Serious
Abatement Date: 02/12/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/27/2017
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0522500
Contest Date: 07/06/2017
Final Order: 01/10/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/10/2019 | $0.00 | 02/12/2019 | Serious | |
Penalty | C: Contested | 07/07/2017 | $0.00 | 07/17/2017 | Serious | |
Penalty | Z: Issued | 06/27/2017 | $0.00 | 07/17/2017 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.147(d)(6): Verification of isolation. Prior to starting work on machines or equipment that have been locked out or tagged out, the authorized employee shall verify that isolation and deenergization of the machine or equipment have been accomplished. a. Located at the Core Baker, employees used a Kirk Key trapped key system in place of lockout/tagout. Verification of isolation and de-energization was not performed prior to employees performing servicing/maintenance activities, thereby exposing the employees to a stuck-by/caught-between hazard.