Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1199761.015
Citation: 01005B
Citation Type: Serious
Abatement Date: 03/02/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/12/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0729300
Contest Date:
Final Order: 02/03/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/03/2017 | $0.00 | 03/02/2017 | Serious | |
Penalty | Z: Issued | 01/12/2017 | $0.00 | 03/02/2017 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables were used to run through walls, ceilings, and floors: a/ At the Baler Area, one, orange, flexible cord ran through the sheet metal wall of the building to power an oil heating unit belonging to the Economy Baler, m/n 6031, s/n 58735.