Violation Detail
Standard Cited: 19260055 B Gases, vapors, fumes, dusts, and mists.
Inspection Nr: 1100042.015
Citation: 01005B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/01/2016
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 02/11/2017
Gravity: 5
Report ID: 0317700
Contest Date: 04/25/2016
Final Order: 12/28/2016
Related Event Code (REC): R
Emphasis:
Substance: 9135
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/28/2016 | $0.00 | 02/11/2017 | Serious | |
Penalty | C: Contested | 04/27/2016 | $0.00 | 06/05/2016 | Serious | |
Penalty | Z: Issued | 04/01/2016 | $0.00 | 06/05/2016 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1926.55(b): Feasible administrative or engineering controls were not implemented to reduce employee exposure(s): a) Danville Borough Municipal Authority Storage Site, an employee, blaster, was exposed to particulates not otherwise regulated (Total Dust) at an 8 hour time weighted average of 447.6 milligrams per cubic meter of air (mg/M3) while removing coatings. Feasible administrative or engineering controls were not implemented to reduce the employee's exposure, on or about October 27, 2015. b) Danville Borough Municipal Authority Storage Site, an employee, blaster, was exposed to particulates not otherwise regulated (Total Dust) at an 8 hour time weighted average of 657.5 milligrams per cubic meter of air (mg/M3) while removing coatings. Feasible administrative or engineering controls were not implemented to reduce the employee's exposure, on or about October 27, 2015. ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED General methods of control would include, but are not limited to the following: 1. Use mechanical exhaust ventilation within the tank. Abatement Schedule Step 1 A written detailed plan of abatement shall be submitted to the Area Director outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposures to hazardous substances as referenced in this citation. This plan shall include, at a minimum, target dates for the following actions, which must be consistent with the abatement dates required by this citation: (1) Evaluation of engineering/administrative control options; (2) Selection of optimum control methods and completion of design; (3) Procurement, installation and operation of selected control measures; (4) Testing and acceptance or modification/redesign of controls. All proposed control measures shall be approved for each particular use by a competent industrial hygienist or other technically qualified person. Step 2 Abatement shall have been completed by the implementation of feasible engineering and /or administrative controls upon verification of their effectiveness in achieving compliance.