Standard Cited: 19260752 E Site layout, site-specific erection plan and construction sequence.
Inspection Nr: 915205.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,300.00
Current Penalty: $6,300.00
Issuance Date: 12/18/2013
Nr Instances: 6
Nr Exposed: 19
Abatement Date: 03/01/2014
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 01/23/2014
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/23/2014 | $6,300.00 | 03/01/2014 | Serious | |
Penalty | Z: Issued | 12/18/2013 | $6,300.00 | 12/19/2013 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1926.752(e): Site-specific erection plan. Where employers elect, due to conditions specific to the site, to develop alternate means and methods that provide employee protection in accordance with �� 1926.753(c)(5), �� 1926.757(a)(4) or �� 1926.757(e)(4), a site-specific erection plan was not developed by a qualified person and was not available at the work site. Guidelines for establishing a site-specific erection plan are contained in Appendix A to this subpart. At the site, on or about June 22, 2013, and in times priorto and thereafter, a specific erection plan for the methods and sequences used was not provided, exposing employees to the hazards of being struck by structural steel. The buildings were erected from one end to the other end and not following the bay erection sequence recommended by the manufacturer. a. Building 1. b. Building 2. c. Building 3. d. Building 6. e. Building 7.