Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 854183.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,400.00
Current Penalty: $2,040.00
Issuance Date: 02/14/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/22/2013
Gravity: 5
Report ID: 0728500
Contest Date:
Final Order: 02/28/2013
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/28/2013 | $2,040.00 | 03/22/2013 | Serious | |
Penalty | Z: Issued | 02/14/2013 | $3,400.00 | 03/22/2013 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): (a) Assembly Area: The Benchmaster 4 ton press did not have the pulleys guarded within seven feet of the floor. The belt and pulleys create an ingoing nippoint which was not guarded.