Violation Detail
Standard Cited: 19100184 C01 Slings.
Inspection Nr: 578180.015
Citation: 01005A
Citation Type: Serious
Abatement Date: 11/30/2012 2
Initial Penalty: $1,200.00
Current Penalty: $720.00
Issuance Date: 10/02/2012
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0317700
Contest Date:
Final Order: 10/31/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/31/2012 | $720.00 | 11/30/2012 | Serious | |
Penalty | Z: Issued | 10/02/2012 | $1,200.00 | 11/01/2012 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.184(c)(1): Sling(s) that were damaged or defective were used: a) Paint booth area: The master coupling links on the "L" hook chain slings (2) were stretched to a near breaking point, as observed on or about August 16, 2012. Abatement Certification Required.