Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 315818484
Citation: 01005A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $7,000.00
Current Penalty: $3,000.00
Issuance Date: 05/21/2012
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/25/2012
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order:
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/06/2012 | $3,000.00 | 06/25/2012 | Serious | |
| Penalty | Z: Issued | 05/21/2012 | $7,000.00 | 06/25/2012 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard: CHEMNEP
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: a) Jobsite: Facility, 5701 Tacony Street - The employer did not establish and implement written mechanical integrity procedures to maintain the on-going integrity of process equipment for the ammonia refrigeration process. NOTE: ABATEMENT DOCUMENTATION REQUIREDATION
Translate