Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 310831912
Citation: 01005A
Citation Type: Serious
Abatement Status: X
Initial Penalty:
Current Penalty: $375.00
Issuance Date: 07/17/2007
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 08/10/2007
Gravity: 03
Report ID: 0627100
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Q: National Office Adjustment | 07/29/2014 | $750.00 | |||
| Penalty | I: Informal Settlement | 08/07/2007 | $375.00 | 08/10/2007 | Serious | |
| Penalty | Z: Issued | 07/17/2007 | $750.00 | 07/23/2007 | Serious |
Translate