Standard Cited: 5A0001 OSH Act General Duty Paragraph

Inspection Nr: 307008029

Citation: 01005A

Citation Type: Serious

Abatement Status: X

Initial Penalty: $5,000.00

Current Penalty: $5,000.00

Issuance Date: 08/12/2005

Nr Instances: 1

Nr Exposed: 5

Abatement Date: 08/24/2005

Gravity: 10

Report ID: 0627400

Contest Date:

Final Order:

Related Event Code (REC):

Emphasis:



Text For Citation: 01 Item/Group: 005A Hazard: LACKTRAIN

Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the condition(s) listed below: a) Greywolf Rig #80, University Block.20, #501, Kermit, TX; On or about 5-7-05 a Link Belt 75 Ton Lattice Boom Crawler Crane, Model Number LS-138H, Serial #B5KI1-361, was not operated according to the manufacturer's specifications. The crane operator had not been properly trained on the type of work being conducted and/or safe operating procedures. The crane operator did not recognize and take the necessary precautions to insure the safe operation of the crane. The operator was instructed to rotate the lattice boom which pulled the bull-rope sideways placing the wire rope under tension. When the wire rope disengaged it struck a nearby employee. Among other methods, one method of abatement is to ensure that crane operators successfully meet the qualifications for the specific type crane they are operating as required by 5-3.1.2 of the American Society of Mechanical Engineers (ASME) B30.5-2000, Mobile And Locomotive Cranes. b) Greywolf Rig #80, University Block.20, #501, Kermit, TX; On or about 5-7-05 the crane operator of a Link Belt 75 Ton Lattice Boom Crawler Crane, Model number LS-138H, Serial #B5KI1-361, responded to the signals of the drilling company tool pusher, a person neither trained nor appointed to act as the signal man for the operation. The operator also responded to the signals from an employee that was not trained in rigging and/or signal operations. The operator was instructed by the tool pusher to rotate the lattice boom which pulled the bull-rope sideways placing the wire rope under tension. When the wire rope disengaged it struck a nearby employee. Among other methods, one method of abatement is to ensure that crane operators are trained and instructed to respond to signals only from the appointed signal man in accordance with section 5-3.1.3(c) of the American Society of Mechanical Engineers (ASME) B30.5-2000, Mobile And Locomotive Cranes. DISCLAIMER: 1) You are not limited to the abatement methods suggested above. 2) The methods explained are general and may not be effective in all cases. 3) The employer is responsible for selecting and carrying out an appropriate method.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.