Violation Detail
Standard Cited: 19100269 M03 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1684216.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,250.00
Current Penalty: $6,250.00
Issuance Date: 01/09/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 02/05/2024
Gravity: 10
Report ID: 0830600
Contest Date:
Final Order: 02/02/2024
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/02/2024 | $6,250.00 | 02/05/2024 | Serious | |
Penalty | Z: Issued | 01/09/2024 | $6,250.00 | 02/05/2024 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.269(m)(3)(ii): The employer did not ensure that all switches, disconnectors, jumpers, taps, and other means through which known sources of electric energy might be supplied to the particular lines and equipment were de-energized / inoperable (i.e. open) and then did not ensure that such means were tagged to indicate that employees were at work: a) On or about July 13, 2023, and at times prior, LND Technical Services, LLC, did not ensure the Alternating Current Switchgear main circuit breaker was in the open position, thereby eliminating potential power transfer backfeeds. This exposed employees to electrical hazards.