Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1652642.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,063.00
Current Penalty: $11,953.00
Issuance Date: 06/02/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/29/2023
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 06/28/2023
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/28/2023 | $11,953.00 | 09/29/2023 | Serious | |
Penalty | Z: Issued | 06/02/2023 | $14,063.00 | 06/16/2023 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle. On our about February 16, 2023, point of operation was not guarded to prevent the operator from having any part of their body in the danger zone during the operation.