Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1619294.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Quick Fix
Initial Penalty: $5,283.00
Current Penalty: $5,000.00
Issuance Date: 01/10/2023
Nr Instances: 1
Nr Exposed: 8
Abatement Date:
Gravity: 1
Report ID: 0112000
Contest Date: 02/06/2023
Final Order: 04/05/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/05/2023 | $5,000.00 | Serious | ||
Penalty | C: Contested | 02/06/2023 | $5,283.00 | Serious | ||
Penalty | Z: Issued | 01/10/2023 | $5,283.00 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: South Building, Warehouse: On, or about, November 1, 2022, a locked chain link fence was installed in the exterior exit route from the warehouse. Special knowledge was required to release the door in the fence.