Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1616081.015
Citation: 01005A
Citation Type: Serious
Abatement Date: 03/09/2023 7
Initial Penalty: $15,625.00
Current Penalty: $9,375.00
Issuance Date: 02/17/2023
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 04/14/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/14/2023 | $9,375.00 | 03/09/2023 | Serious | |
Penalty | Z: Issued | 02/17/2023 | $15,625.00 | 03/09/2023 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): On or about August 17, 2022, and at time prior thereto, the energy sources of the Liberty Lift Pumping Unit/Pump Jack (Model: EG 640-365-168) were not isolated, exposing employees to struck-by, caught-in or -between hazards.