Violation Detail
Standard Cited: 19100217 D09 I Mechanical power presses.
Inspection Nr: 1558277.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,052.00
Current Penalty: $10,000.00
Issuance Date: 03/18/2022
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 04/17/2023
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 04/12/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/12/2022 | $10,000.00 | 04/17/2023 | Serious | |
Penalty | Z: Issued | 03/18/2022 | $13,052.00 | 04/13/2022 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.217(d)(9)(i):The employer did not establish a die setting procedure for mechanical power press(es) that would ensure compliance with 29 CFR 1910.217(b)(c) (a) PRODUCTION AREA, METAL DEPARTMENT - Employee(s) replaced and set the die on the General Electric C-45 Bliss power press, and the employer had not developed and required a die setting procedure for employees to follow, on or about October 8, 2021. (b) PRODUCTION AREA, METAL DEPARTMENT - Employee(s) replaced and set the die on the Niagra M-60 power press, and the employer had not developed and required a die setting procedure for employees to follow, on or about October 8, 2021. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.