Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1443817.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,603.00
Current Penalty: $5,500.00
Issuance Date: 05/06/2020
Nr Instances: 1
Nr Exposed: 500
Abatement Date: 08/31/2020
Gravity: 5
Report ID: 0134000
Contest Date:
Final Order: 06/01/2020
Related Event Code (REC):
Emphasis:
Substance: 0170
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/01/2020 | $5,500.00 | 08/31/2020 | Serious | |
Penalty | Z: Issued | 05/06/2020 | $10,603.00 | 06/05/2020 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.119(j)(2): Written procedures to maintain the on-going integrity of process equipment have not been established: (a) Location - 330 Lynnway, Lynn, MA: On or about 11/07/2019, adequate written procedures to maintain the on-going integrity of the Mycom and Frick compressors of the ammonia refrigeration system have not been established. (b) Location - 330 Lynnway, Lynn, MA: On or about 11/07/2019, adequate written procedures to maintain the on-going integrity of insulated and non-insulated piping of the ammonia refrigeration have not been established.