Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1432728.015
Citation: 01005A
Citation Type: Serious
Abatement Date: 03/18/2020 2
Initial Penalty: $9,639.00
Current Penalty: $5,784.00
Issuance Date: 03/04/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 03/27/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/27/2020 | $5,784.00 | 03/18/2020 | Serious | |
Penalty | Z: Issued | 03/04/2020 | $9,639.00 | 03/18/2020 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): (a) Mineral mixing area at Sheldon, WI location of Heartland Cooperative Services; A power transmission pulley on the small mixer (mini-mixer) was not guarded.