Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1375508.015
Citation: 01005A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,661.00
Current Penalty: $5,000.00
Issuance Date: 07/26/2019
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 08/21/2019
Gravity:
Report ID: 0418400
Contest Date:
Final Order: 08/21/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/21/2019 | $5,000.00 | 08/21/2019 | Other | |
Penalty | Z: Issued | 07/26/2019 | $9,661.00 | 08/21/2019 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws: a) Portioning (DSI/Blue Room) - On or about January 30, 2019, the outer sheathing on the flexible conduit that energized the hopper motor on the long blue infeed conveyor line was pulled away from its connection point on the wire housing, thus exposing employees to electrical hazards.