Violation Detail
Standard Cited: 19101026 D05
Inspection Nr: 1358526.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $4,632.00
Issuance Date: 04/11/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/23/2019
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 05/01/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/01/2019 | $4,632.00 | 04/23/2019 | Serious | |
Penalty | Z: Issued | 04/11/2019 | $9,282.00 | 04/23/2019 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.1026(d)(5): The employer used a method of air monitoring and analysis that either could not measure chromium (VI) to within an accuracy of plus or minus 25 percent, or could not produce accurate measurements to within a statistical confidence level of 95 percent for airborne concentrations at or above the action level: In the facility at 33 Haynes Circle, Chicopee, MA: On and before January 9, 2019, the employer performed personal air monitoring using a low flow pump with a rate ranging from 0.135-0.185 L/Min, compared to the recommended flow rate for hexavalent chromium of 2.0 L/Min. Results obtained utilizing the incorrect flow rate were used to exempt the packaging department from monitoring.