Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1308110.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,391.00
Current Penalty: $6,744.00
Issuance Date: 09/12/2018
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 10/04/2018
Gravity: 5
Report ID: 0213900
Contest Date:
Final Order: 10/04/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/04/2018 | $6,744.00 | 10/04/2018 | Serious | |
Penalty | Z: Issued | 09/12/2018 | $7,391.00 | 10/04/2018 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a) Plant 1 (Block Plant): The pulley on the block machine operating a vertically inclined belt at 6-10 rpms was not provided with a guard to protect employees against ingoing nip points, on or about 3/16/18. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.