Violation Detail
Standard Cited: 19100037 B01 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1303654.015
Citation: 01005A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,467.00
Current Penalty: $3,000.00
Issuance Date: 07/10/2018
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 07/30/2018
Gravity: 5
Report ID: 0317900
Contest Date:
Final Order: 08/01/2018
Related Event Code (REC):
Emphasis:
Substance: 2590
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/01/2018 | $3,000.00 | 07/30/2018 | Serious | |
Penalty | Z: Issued | 07/10/2018 | $6,467.00 | 07/30/2018 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.37(b)(1): The exit route was not adequately lit so that an employee with normal vision could see along the exit route: a) Atlantic Precast Concrete - On or about March 15, 2018, the employer's emergency lighting system in the Channel Department was inoperable and prevented employees with normal vision from seeing along their exit route. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.