Violation Detail
Standard Cited: 19260251 A01 Rigging equipment for material handling.
Inspection Nr: 1276626.015
Citation: 01005A
Citation Type: Serious
Abatement Date: 03/15/2018 2
Initial Penalty: $3,696.00
Current Penalty: $2,217.60
Issuance Date: 03/05/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0316400
Contest Date:
Final Order: 03/28/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/28/2018 | $2,217.60 | 03/15/2018 | Serious | |
Penalty | Z: Issued | 03/05/2018 | $3,696.00 | 03/15/2018 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1926.251(a)(1): Rigging equipment for material handling was not inspected prior to use on each shift and as necessary during its use to ensure that it is safe. Defective rigging equipment was not removed from service. (a) VLR Area: On or about November 11, 2017, and times prior, a polyester web sling showing signs of excessive wear, such as the visibility of the red warning yarn, was used and available for use on the jobsite.