Violation Detail
Standard Cited: 19101025 H01 Lead.
Inspection Nr: 1258467.015
Citation: 01005A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $5,550.00
Issuance Date: 01/19/2018
Nr Instances: 6
Nr Exposed: 35
Abatement Date: 02/12/2018
Gravity:
Report ID: 0636900
Contest Date: 02/19/2018
Final Order: 05/02/2019
Related Event Code (REC): C
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 05/02/2019 | $5,550.00 | 02/12/2018 | Other | |
Penalty | C: Contested | 03/07/2018 | $12,934.00 | 02/12/2018 | Serious | |
Penalty | Z: Issued | 01/19/2018 | $12,934.00 | 02/12/2018 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.1025(h)(1): All surfaces were not maintained as free as practicable of accumulations of lead: a) Break Area/Lunch room Entrance Floor, on or about August 30, 2017, the floor in the break room/Lunch area contained lead and was not decontaminated. b) South Bathroom Floor, on or about August 30, 2017, the floor in the south bathroom floor area contained lead and was not decontaminated. c) North Bathroom floor, on or about August 30, 2017, the floor in the north area contained lead and was not decontaminated. d) D-Line work Area, on or about August 30, 2017, the bench top on the D-line closest to the break area contained lead and was not decontaminated. e) D-Line Work Area, on or about August 30, 2017, the D-Line Floor closest to break area area contained lead and was not decontaminated. f) Bulb Work Area, on or about August 30, 2017, the bulb work area (@ roller area bench) contained lead and was not decontaminated. g) Disassembly Area, on or about August 30, 2017, the floor in the D-Line/Glass floor area in front of the scale contained lead and was not decontaminated. h) Glass Area, on or about August 30, 2017, the floor in the Glass floor area contained lead and was not decontaminated. i) Glass Area, on or about August 30, 2017, the floor in the Glass floor area next to batteries contained lead and was not decontaminated. j) Glass Area, on or about August 30, 2017, the work area in the Glass at HIB work area (top) contained lead and was not decontaminated. k) Glass Area, on or about August 30, 2017, the floor in the Glass area next to Torit/sweep out room floor contained lead and was not decontaminated. l) Office Area, on or about August 30, 2017, the floor at the entrance to the main office from the disassembly work area contained lead and was not decontaminated.