Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.

Inspection Nr: 999489.015

Citation: 01005

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $5,000.00

Current Penalty: $5,000.00

Issuance Date: 04/01/2015

Nr Instances: 2

Nr Exposed: 14

Abatement Date: 04/22/2015

Gravity: 5

Report ID: 0636900

Contest Date:

Final Order: 04/20/2015

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 04/20/2015 $5,000.00 04/22/2015 Serious  
Penalty Z: Issued 04/01/2015 $5,000.00 04/22/2015 Serious  

Text For Citation: 01 Item/Group: 005 Hazard:

29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices. The employer does not ensure that equipment in the process complies with recognized and generally accepted good engineering practices (RAGAGEP) a. The violation occurred in the Springtown Enbridge Facility on or about October 9, 2014 and at times prior thereto where the employer failed to ensure pressure-relief-valve stacks complied with the American Petroleum Institute (API) 521 such as but not limited to: 1. Pressure-relief-valve stack for Amine Storage Tank (TK-36) on P&ID SPR-MO-1-542A Rev. 3 2. Pressure-relief-valve stack for Air Instrument Receiver (TK-IA1) on P&ID SPR-MO-1-701 Rev. 3 This condition exposed employees to inhalation, fire, and explosion hazards from releases of hazardous materials. b. The violation occurred in the Springtown Enbridge Facility on or about October 9, 2014 and at times prior thereto where the employer failed to ensure car seals on block/stop valves of relief devices complied with the American Standard Mechanical Engineer (ASME) Boiler and Pressure Vessel Code Section VIII for the flowing pressure relief valves such as but not limited to: 1. Block valve for PSV-IA1 on P&ID SPR-MO-1-701 Rev. 3 2. Block Valve for PSV- IA3 on P&ID SPR-MO-1-701 Rev. 3 3. Block valve for PSV-6335 (717A) on P&ID SPR-MO-1-405 Rev. 25 4. Block valve for PSV-3367 (718) on P&ID SPR-MO-1-405 Rev. 25 This condition exposed employees to inhalation, fire, and explosion hazards from releases of hazardous materials. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date the employer must submit documentation showing that it is in compliance with the standard, including describing the steps it is taking to ensure that equipment in the process complies with recognized and generally accepted good engineering practices.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.