Violation Detail
Standard Cited: 19100119 E05 Process safety management of highly hazardous chemicals.
Inspection Nr: 995848.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,000.00
Issuance Date: 03/13/2015
Nr Instances: 3
Nr Exposed: 75
Abatement Date: 04/17/2015
Gravity: 10
Report ID: 0213100
Contest Date:
Final Order: 03/31/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/31/2015 | $4,000.00 | 04/17/2015 | Serious | |
Penalty | Z: Issued | 03/13/2015 | $7,000.00 | 04/17/2015 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.119(e)(5): The employer did not assure that PHA recommendations were resolved in a timely manner. Butane Bulk Storage and Foam Extrusion Process -- On or prior to September 18, 2014, the status of the following recommendations of the June 2012 PHA were not resolved: (a) Node 1, #11 -- 11.6.1.1 "Add PSM mechanical integrity and annual operating procedures review to quarterly management review"; date to be completed by: 10/14/15 (b) Node 3, #20 -- 19.3.1.1 "Investigate installation of flow or pressure switch to shut down Corken of feed to LEWA pumps. Stainless steel above and below ground." Stainless tubing running into building." date to be completed by: 12/01/14 (c) Node 3, #29 -- 29.2.1.1 "Investigate underground piping inspection criteria and standards"; date to be completed by: 12/01/14