Violation Detail
Standard Cited: 19100303 B08 III General.
Inspection Nr: 989198.015
Citation: 01005
Citation Type: Other
Abatement Date: 01/20/2015 2
Initial Penalty: $2,550.00
Current Penalty: $2,550.00
Issuance Date: 01/07/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0627500
Contest Date: 02/05/2015
Final Order: 12/28/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 12/28/2015 | $2,550.00 | 01/20/2015 | Other | |
Penalty | C: Contested | 02/05/2015 | $2,550.00 | 01/20/2015 | Serious | |
Penalty | Z: Issued | 01/07/2015 | $2,550.00 | 01/20/2015 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.303(b)(8)(iii): Electric equipment provided with ventilating openings was installed so that walls or other obstructions prevent the free circulation of air through the equipment: On or about August 6, 2014, and at times prior thereto, the electrical transformer located on left side of doorway of Rig Manager trailer was positioned close to the wall impeding air circulation. This condition exposed the employees to a fire hazard.