Standard Cited: 19100119 E03 IV Process safety management of highly hazardous chemicals.

Inspection Nr: 985164.015

Citation: 01005

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $5,500.00

Current Penalty: $5,500.00

Issuance Date: 01/14/2015

Nr Instances: 2

Nr Exposed: 44

Abatement Date: 01/04/2016

Gravity: 5

Report ID: 0522500

Contest Date: 02/03/2015

Final Order: 10/28/2015

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 10/28/2015 $5,500.00 01/04/2016 Serious  
Penalty C: Contested 02/05/2015 $5,500.00 02/19/2015 Serious  
Penalty Z: Issued 01/14/2015 $5,500.00 02/19/2015 Serious  

Text For Citation: 01 Item/Group: 005 Hazard:

29 CFR 1910.119(e)(3)(iv): The process hazard analysis shall address: Consequences of failure of engineering and administrative controls: a. The employer's 2010 revalidation PHA for the No. 2 Formaldehyde Plant did not address the consequences of failure of the plant rate reduction interlock for the secondary blower #4 to reduce methanol flow to 7.0 gallons per minute. b. The employer's 2010 revalidation PHA for the No. 2 Formaldehyde Plant did not address the consequences of failure of engineering controls such as, but not limited to, the following safeguards: high oxygen concentration alarm, low oxygen concentration alarm, high-high oxygen concentration interlock, high-high-high oxygen concentration interlock, low-low oxygen concentration interlock, high methanol volume percent alarm, high-high methanol volume percent interlock, high vaporizer outlet temperature alarm, low vaporizer outlet temperature alarm, low-low vaporizer outlet temperature interlock, high converter catalyst bed temperature alarm, high-high converter tube hot spot temperature/high average tube hot spot temperature interlock, two high-high converter tube hot spot temperature interlock, high-high converter hot spot temperature/temperature rate of rise interlock, high converter exit gas temperature alarm, high-high converter exit gas temperature interlock, high-high-high converter exit gas temperature interlock, high converter pressure alarm, low converter pressure alarm, high-high converter pressure interlock, low-low converter pressure interlock, low HTF flow rate to converter alarm, low-low HTF flow rate to converter interlock, high HTF condenser steam pressure alarm, low HTF condenser steam pressure alarm, high HTF system pressure alarm, low HTF system pressure alarm, high-high HTF system pressure interlock, high HTF condenser boiler feed water level alarm, low HTF condenser boiler feed water level alarm, low-low HTF condenser boiler feed water level interlock, primary blower failure interlock, secondary blower failure interlock, high/low methanol flow alarms, and low methanol flow interlock.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.