Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 983397.015
Citation: 01005
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,975.00
Current Penalty: $2,082.50
Issuance Date: 10/15/2014
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0729300
Contest Date:
Final Order: 10/17/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/17/2014 | $2,082.50 | Serious | ||
| Penalty | Z: Issued | 10/15/2014 | $2,975.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and/or cables were run through holes in walls, ceilings, or floors: Batch Room: Flexible cords and flexible cord sets used to energize various pieces of electrical equipment were run through holes in the ceiling.
Translate