Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 973872.015
Citation: 01005
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,500.00
Current Penalty: $2,170.00
Issuance Date: 09/30/2014
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 10/24/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/24/2014 | $2,170.00 | Serious | ||
| Penalty | Z: Issued | 09/30/2014 | $3,500.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.107(b)(5)(i): The spraying operations was not designed, installed or maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) was not less than 100 linear feet per minute Spray Shop: On, or about, April 24, 2014, the average velocity over the open face of the Primer Booth was 50 feet per minute due to a lack of make-up air in the work area.