Violation Detail
Standard Cited: 19100147 C07 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 956430.015
Citation: 01005
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,295.00
Current Penalty: $2,295.00
Issuance Date: 03/25/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/04/2014
Gravity: 1
Report ID: 0317700
Contest Date:
Final Order: 04/16/2014
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/16/2014 | $2,295.00 | 04/04/2014 | Serious | |
Penalty | Z: Issued | 03/25/2014 | $2,295.00 | 04/04/2014 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees: a) Plant 2 welding area; An untrained employee assisted in replacing blades while lockout tag out was used to control the energy on the Geka Power Sheer Model Number HYD110/S, on or about 01/28/2014. Abatement Certification Required