Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 915895.015
Citation: 01005
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $3,825.00
Current Penalty: $2,486.00
Issuance Date: 12/23/2013
Nr Instances: 5
Nr Exposed: 12
Abatement Date: 03/07/2014
Gravity:
Report ID: 0627510
Contest Date:
Final Order: 01/22/2014
Related Event Code (REC): C
Emphasis:
Substance: 1480
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection | 
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/22/2014 | $2,486.00 | 03/07/2014 | Other | |
| Penalty | Z: Issued | 12/23/2013 | $3,825.00 | 01/03/2014 | Serious | 
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: Rig #4: On or about June 27, 2013, the employer did not ensure that the ground from equipment was permanent, continous, and effective for the following; a) centrifugal pumps, b) heat exchanger, c) toolpusher trailer, d) generator room, e) fluid pump motors, f) drilling rig. This condition exposed employees to the hazards associated with electrical shock, arc, sparks.
Translate