Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.

Inspection Nr: 908983.015

Citation: 01005

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $2,800.00

Current Penalty: $1,820.00

Issuance Date: 11/27/2013

Nr Instances: 5

Nr Exposed: 13

Abatement Date: 02/13/2014

Gravity: 10

Report ID: 0214200

Contest Date: 12/16/2013

Final Order: 04/24/2014

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 04/24/2014 $1,820.00 02/13/2014 Serious  
Penalty C: Contested 12/18/2013 $2,800.00 01/16/2014 Serious  
Penalty Z: Issued 11/27/2013 $2,800.00 01/16/2014 Serious  

Text For Citation: 01 Item/Group: 005 Hazard:

29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include the piping and instrument diagrams (P&ID's): a) Establishment - compressor room The employer did not ensure that the written process safety information included all the necessary information pertaining to the equipment in the process when an existing shutoff valve between Compressors # 1,2,3, & 4 and the high pressure dryer was not represented on P&ID sheet # B09, B11, B13, & B15. b) Establishment - compressor room The employer did not ensure that written process safety information including all the necessary information pertaining to the equipment in the process in that the existing pressure gauge and valve at the bottom of the high pressure dryer system's flash arrestor for systems #1,2,3, & 4 were not represented on P&ID sheet # B09, B11, B13 & B15. c) Establishment - compressor room The employer did not ensure that written process safety information accurately reflected existing equipment in the process in that valve #X168J in high pressure dryer system #1, valve #X181J in high pressure dryer system #2, valve #X194J in high pressure dryer system #3, however these valves do not exist in the plant process. d) Establishment - fill room The employer did not ensure that the written process safety information included all the necessary information pertaining to the equipment in the process when an existing valve installed in Fill Rack #7 was not represented on P&ID sheet # B17. e) Establishment - trailer manifold The employer did not ensure that the written process safety information included all the necessary information pertaining to the equipment in the process when the fail safe position of the nitrogen emergency automatic valve was not identified on P&ID sheet # B02. Violations observed on or about 5/30/2013

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.