Violation Detail
Standard Cited: 19100269 L02 Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 899400.015
Citation: 01005
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $7,000.00
Current Penalty: $4,550.00
Issuance Date: 05/31/2013
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 07/10/2014
Gravity: 10
Report ID: 0729300
Contest Date: 06/24/2013
Final Order: 07/18/2014
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/18/2014 | $4,550.00 | 07/10/2014 | Serious | |
Penalty | C: Contested | 06/27/2013 | $7,000.00 | 06/12/2013 | Serious | |
Penalty | Z: Issued | 05/31/2013 | $7,000.00 | 06/12/2013 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.269(l)(2): The employer did not ensure that no employee(s) approached or took conductive objects closer to exposed energized parts than set forth in Tables R-6 through R-10: At the AMEREN-UE Calloway Nuclear Plant, switchyard, specifically at Bus B, 52-4, an arc flash occurred on or about 04/02/13 severely burning employees. Employee(s) approached to within six inches of the live connectors located inside of this piece of equipment. Bus B, 52-4 was powered by 13.8kv at the time. Table R-6 requires that a minimum approach distance of 26 inches be maintained for that amount of voltage.